Mobley EVRW – Mobley, WV

img

Job Description

  • Permanent Soldier Pile and lagging wall to provide more space for an additional plant. We utilized Soldier piles, Pre-cast concrete lagging, and Tie-backs to provide a space for 200,000 yards of excavated material. The current plants all remained operational during the construction of the wall.
  • Installed 200 Soldier Piles upwards of 60’ long.
  • Installed ~38,000 Square Feet of Concrete Lagging
  • Installed 580 – 296 Kip Tie-back Anchors