I-81 Widening S of US11 WV to N of MD 63/68 – Phase 1 of 3

img

Job Description

  • Redstone International teamed up with Triton Construction in the design phase of the project to develop a temporary abutment system crossing the Potomac River that would meet MDSHA stringent requirements.
  • Redstone is installing temporary Rock Anchors through pre-fabricated abutments that will enable Triton to cross the Potomac River to widen the I-81 bridge