Findlay WTP – Findlay, OH

img

Job Description

  • Drilling, installation, grouting and proof testing of 75 Rock Anchors @ 30’ inside of the underground water tank for the city of Findlay
  • Artesian water was encountered immediately underlying the concrete slab of the water tank. After the installation of the tension / compression piles, chemical grouting was utilized to seal the water off to enable a new slab to be poured